EU-173 | Design Services For Preparation Of Preliminary Material Take Off | |
EU-172 | Design Verification Of Existing Supporting Structure Of Reactor (4105d) | NODCO |
EU-171 | Rasgas-Epic Services For Warehouse Roof Replacement | |
EU-170 | Engineering Service For Construction Of Additional Car Parking | MEDGULF |
EU-169 | Engineering Services For Temporary Covered Storage In W8 | |
EU-168 | Design And Built For North And South Campus Chilled Water Interconnection Works | QATAR FOUNDATION |
EU-167 | Tse & Twin Sewer Diversion At Al Khor Coastal Rd / Project 60 | M/s QP |
EU-166 | Epic Of Walkover Bridges In Tankfarm Area, Refinery, Mesaieed | DPF |
EU-165 | Engineering Services For Stress Analysis & Hydraulic Analysis | WORLY PARSONS |
EU-164 | Engineering Services For 12†Hydraulic Table | |
EU-163 | Epic Of Permanent Power Supply To Site Establishment | |
EU-162 | Engineering Services For Gantry Crane Foundation | DPF |
EU-161 | Epic For Upgrading 500kva Emergency Dg Set At Gd Station 'S', Mesaieed | QP |
2941 | Stress Analysis For Chilled Water Supply Prps 1&5 | |
EU-158 | Design Verfication For Prps3 Potable Pumping Station | |
EU-157 | Design Of Demountable Fence At Alsadd Training Field | ASPIRE ZONE |
EU-156 | Engineering Services For Cathodic Protection Works For Trains - 1,2 And Utilities | RAS GAS |
EU-155 | Design Of Chilled Water Lline Of Cup-2 And Cup-4 | HAMAD INTERNATIONAL AIRPORT, QATAR |
EU-153 | Provision Of Two Epc Combined Projects In Qg2 | |
EU-090A | Hrsg Blowdown Water Recovery System – Feasibility & Concept Study | |
EU-151 | New Cooling Unit Installation At Q-Chem And Rloc | RLOC |
EU-150 | Engineering Services For 2 Nos Of Electrical Pcrs At Qp Refinery Mesaieed | QP |
EU-149 | Engineering Service For Cp13 Dg And Land Fuel System | NPP |
EU-148 | Qpd-Engineering Services For New As Well Tie In Work | QPD |
EU-146 | Qapco-Testing Of Existing Gas Turbines Foundations (2 Nos) | |
EU-140 | Modification Of Waste Water Treatment Plan | DANEM |
EU-126 | Epic For Replacement Of Battery Chargers At Ngl Plants | M/s QP |
2820 | Shop Drawing Preparation For Six Substations | M/s. IA |
EU-123 | Completion Of Remaining Works Of Precast Concrete Wall & Shelters At Various Stations In Dukhan Fields | M/s. QP |
EU-122 | Epic Of Various Mechanical Pcrs At Nglâ€4 Plant, Mesaieed | QATAR PETROLEUM(QP – MESAIEED) |
EU-117 | Epic For Cathodic Protection System Of Jtf Water Tanks Within Dukhan Fields | M/s. QP |
EU-116 | Engineering Services For Land & Marine Fuel System (Cpâ€12 & Cpâ€14) | M/s. STATE OF QATAR |
EU-110 | Engineering Services For Parking Lot | M/s. RLPC |
2790 | Review & Endorsement Of Design Of Sng System | BURJ MARINA LUSAIL QATAR |
EU-0100 | Qapco-Redundant Equipment Demolition Project | |
EU-098 | Engineering Services For Fire Suppression Sprinkler System For Rlpc Warehouse | |
EU-097 | Engineering Service For Stress Analysis(Plumbing) | |
EU-096 | Qp-Epic For Flammable And Toxic Gas Detectors At Rlc | |
EU-094 | Engineering Service For Stress Analysis For Land Np 0032 | |
EU-093 | Electrical Pcrs At Qp Refinery Mesaieed | |
EU-092 | Epic For Installation Of Fo Cables From Land Fall Joint To Qp | |
EU-091 | Engineering Services For Upgrading And H2s04 System At Qg2 | |
EU-089 | Lusail-Gas Farm System For Lusail City Development | |
EU-087 | Lusail-Consultancy Services For Gas Supply Line For Residential Building B+G+4 | |
EU-082 | Tanks Rehabilitation Works (Mesaieed) | |
EU-080 | Kahramaa-Pumping Station No-2 Salwa Industrial Rps | |
EU-071 | Construction Of Central Service Unit 4 (Csu 4) 40ktr Packed Water Chilled Plant | |
EU-070 | Lt 13111800 - Epic Of Access Platforms In Dukhan Fields | |
EU-064 | Trags - 3 Combined Projects | |
EU-056 | Qchem - Trags - Rigging Study | |
EU-045 | Engineering, Procurement And Construction Of Muster Points (Mp) For Qg- 3&4 Ir Plant | |
EU-038 | Three Combined Projects | |
EU-032 | Nine Combined Epc Projects | |